HIGH SPEED TO GALICIA
by Mike Bent David Gubler via Wikimedia Creative Commons Over the past 160 years three railways have been built between Castilla-León and the far northwest of Spain. the first took 21 years to complete, the second 31 years, and the third, 21 years.
The first two railways
The first was the single track main line from A Coruña via Betanzos. Lugo, Monforte de Lemos, Ponferrada and León to Palencia and Venta de Baños, the junction with the Madrid to Irún main line. Built between 1862 and 1 September 1883, this 541.1 km railway’s principal civil engineering features are 85 tunnels (three subsequently daylighted), the longest Oural, 1905 m, north of Monforte, La Chanca viaduct immediately to the southeast of Lugo station (20 arch spans each of…